Walks by the water
A two-kilometre promenade along Yas Canal links the residential quarters with the marina and the beaches.
A master-planned coastal community on the waters of Yas Canal in Al Bahia: low-density development where 60% of the territory is given over to open green space.
The video conveys the scale of the master plan and its connection to the water.
A master-planned coastal community in Al Bahia, along the E10 and E12 corridors.
The project covers 38 million square feet — around 3.53 million square metres. It is low-density, nature-oriented development where space, light and movement are the guiding architectural principles.
More than 50,000 trees are planted across the territory, shaping forest landscapes and shaded pedestrian walkways. Walking routes take priority over car traffic.
The developer enters the UAE capital's market for the first time: this is its first large-scale project in Abu Dhabi, after 50 years of history and projects in Dubai and Umm Al Quwain.
The morning starts on the 18-kilometre wellness loop, suitable for walking, running and cycling through the green landscape. During the day, part of the territory works as a place for quiet work away from home.
In the evening residents head to the water: the two-kilometre waterfront with its promenade and marina forms a walking zone, while the private beaches give resort-level access to the sea.
A two-kilometre promenade along Yas Canal links the residential quarters with the marina and the beaches.
The 18-kilometre wellness loop runs through the forest landscapes of the community.
Low-density development and the priority given to pedestrian routes keep noise and traffic down inside the district.

The range spans apartments, townhouses and villas — from compact formats to spacious residences with several bedrooms.
The information on this page is not a public offer. Please confirm current prices and unit availability with a consultant.
The payment plan is built around a long construction horizon and spread across its stages.
20% is paid on booking, 40% during construction, and 40% on handover.
Handover of the first phase is scheduled for the fourth quarter of 2029.
The stated return potential is 6–9%.
The developer's first project in the capital, a shortage of quality supply, a location in a growth zone and the new Disney theme park on Yas Island all support demand.
A consultant will match a unit to your scenario — from a compact apartment to a villa in the coastal part of the community.
The project sits in Al Bahia, along the E10 and E12 corridors, right on Yas Canal. Six separate entry and exit points keep traffic flowing, while the strategic position between the two largest emirates makes the community a convenient base for those who travel between Dubai and Abu Dhabi. Direct access to the waterfront and marina is part of everyday life here.
Al Bahia is one of Abu Dhabi's key development corridors, where demand for rental and owner-occupied housing is concentrated. The Yas Island entertainment parks are nearby, and the new Disney theme park adds tourist appeal to the area.
The community is built around water and greenery: the waterfront, the marina and the park spaces set the rhythm of everyday life.

Design, engineering and construction are carried out by the developer's own teams through a vertically integrated model, which shapes quality at every stage.
Residences are designed as smart home-ready: modern technology is integrated into daily life, while floor-to-ceiling panoramic windows bring in natural light.
Contemporary architecture is paired with spacious layouts and high-quality finishing materials.
We clarify the brief: leisure, investment, relocation, budget and timing.
We prepare a selection of layouts and a financial model: yield, costs and payment scenarios.
We arrange an online or in-person viewing and answer questions about the project.
Reservation, contract, payments to schedule, handover.
Handover of the first phase is scheduled for the fourth quarter of 2029.
The project offers apartments, townhouses and villas — from compact formats to spacious residences with several bedrooms.
Three international schools and medical facilities are planned within the project.
The developer reports strong activity from local buyers since launch. After a short-term slowdown during regional events, demand doubled, which speaks to investor confidence in the project.
The community stands on Yas Canal: a two-kilometre waterfront with a promenade, an integrated marina with 130 berths and private beaches with resort-level access.
We will send current prices, floor plans and payment terms. We will answer questions about the area, yield and the purchase process — no spam, no pushy calls.
Leave your contact — we will send the PDF with floor plans and prices, and follow up through whichever channel suits you best.
The brochure is opening in a new tab. If your browser blocked it, use the button below.
Open the brochure Join our real estate Telegram group